PSC CIC for Cargo Securing
Back to BlogIndustry Trends

PSC CIC for Cargo Securing

Oleg Anufriiev

Oleg Anufriiev

Master Mariner @ Container ships · October 31, 2026

PSC CIC 2026: Cargo Securing — A Master's Practical Guide to Inspection Readiness

Don't prepare to answer “Yes”. Prepare to demonstrate why the answer is “Yes”.

From 1 September to 30 November 2026, the Paris MoU and Tokyo MoU are conducting a joint Concentrated Inspection Campaign (CIC) on Cargo Securing.

The official questionnaire contains ten main questions covering the Cargo Securing Manual (CSM), officers' knowledge, cargo stowage, securing equipment, safe access, bridge visibility and heavy-weather procedures.

Several questions are marked as potential grounds for detention.

But there is something more important than simply knowing the questionnaire.

What happens when the Port State Control Officer (PSCO) asks you to prove your answer?

As a Master, I prefer to prepare officers for the inspection itself, not just for the questions on paper.

Here is how I would approach cargo securing readiness onboard.

1. Start with the Cargo Securing Manual

Every deck officer knows that the approved Cargo Securing Manual must be available onboard.

But having the manual is one thing. Knowing how to use it is another.

Ask your Chief Officer a few straightforward questions.

Where is the approved lashing arrangement for a selected bay? What is the maximum permitted stack mass? What are the tier weight limitations? What securing equipment is approved for that position?

And an even simpler question: what is the difference between standardized, semi-standardized and non-standardized cargo?

These are not examination questions. They are matters officers deal with during cargo planning and loading.

A PSCO may not be interested in hearing a definition from memory. He may simply ask the officer to open the relevant section and explain the arrangement.

Officer familiarization means being able to find and apply the correct information — not just knowing that the manual exists.

2. The CSM, lashing software and actual deck must match

For container vessels, one of the most useful checks is to compare three things:

Approved CSM → Lashing software → Actual deck arrangement

The CSM gives the approved arrangements, limitations and assumptions.

The loading or lashing software checks the actual cargo condition against the relevant limits.

And the deck shows what has really been fitted.

All three must tell the same story.

You may have an acceptable software calculation, but what if the wrong lashing rod has been used? What if a twistlock is not properly engaged? What if the actual arrangement differs from the approved bay plan?

A green result on the computer does not automatically mean that everything is correct outside.

This is why I recommend a simple exercise before PSC: select a loaded bay, preferably at random, and check the entire arrangement from the cargo plan to the actual deck.

Do not limit yourself to the bay loaded at the last port. Cargo loaded several ports ago is still onboard and remains the ship's responsibility.

3. Stack weight alone does not tell the whole story

Consider two container stacks with the same total weight and the same vertical weight distribution.

One arrangement may be acceptable while the other exceeds permissible securing loads.

Why?

Because the forces acting on the stack may be different.

Wind exposure is one example. A stack exposed to additional transverse wind loads may have higher racking forces, lifting forces or corner post loads than a similar protected stack.

GM is another important factor.

Cargo Securing Manual examples are often based on specific assumptions, including GM.

If the actual departure GM is higher than the value used for a particular example, the resulting accelerations and securing forces may also be higher.

This does not mean that every increase in GM makes a stack unacceptable. It means that the actual condition must be checked against the approved calculation basis.

The correct approach is to verify the loading condition using the approved CSM method or properly configured lashing software.

If the limits are exceeded, corrective action may include reducing stack mass, reducing stack height or revising the weight distribution.

Being within the published stack weight limit is not enough if the securing forces exceed their permissible values.

4. Cargo securing equipment: correct type, correct condition

One of the areas specifically covered by the CIC is portable cargo securing equipment.

The vessel must carry sufficient approved equipment of the correct brand and type for the actual cargo arrangement.

This sounds obvious, but there is a common mistake:

Just because a device fits does not mean it is approved.

Different twistlocks, midlocks, lashing rods and turnbuckles may look similar. That does not make them interchangeable.

The Chief Officer should know which equipment is approved, where it can be used and how to identify it.

The CSM and manufacturer's instructions are the starting points.

Markings, identification and, where specified, colour coding can also be important.

Another matter is damaged equipment.

A seized or damaged twistlock should not simply return to the serviceable stock after an unofficial repair.

Before attempting to repair load-bearing cargo securing equipment, check whether the work is actually permitted by the applicable manufacturer's instructions, CSM and approval arrangements.

Replacing an approved spare part or carrying out specified servicing is not the same as welding or structurally modifying a load-bearing device.

If a repair is not authorised, the equipment should be rejected, segregated, replaced and recorded.

And make sure rejected equipment cannot accidentally be used again.

5. Don't forget what is welded to the ship

When checking cargo securing equipment, officers often concentrate on portable gear.

Twistlocks, lashing rods and turnbuckles receive plenty of attention because they are handled during cargo operations.

But fixed securing equipment deserves the same attention.

Deck sockets, twistlock foundations, lashing eyes, pad eyes, lashing bridges, gratings and other fixed arrangements can suffer from corrosion, wastage, cracks or deformation.

These are not minor details.

Even if the portable securing gear is in good condition, the arrangement cannot be considered satisfactory if the securing points or supporting structures are defective.

During a pre-arrival inspection, I would include fixed equipment in the deck round instead of treating it as a separate issue to be checked later.

Don't only check what moves. Check what is welded to the ship.

6. Cargo Safe Access Plan: check the real access

The official questionnaire includes a question about the Cargo Safe Access Plan (CSAP).

For vessels where the CSAP requirements apply, the plan is an important part of providing safe access to container securing arrangements.

But a drawing alone does not make an area safe.

Walk the actual access routes.

Are the lashing bridges and platforms safe? Are gratings, ladders, guardrails and protective stanchions in good condition? Is the lighting suitable for lashing operations?

What about fall protection arrangements?

A route shown on the plan may be unusable in practice because a stanchion is seized, a grating is damaged or lighting is missing.

Although the CSAP question itself is marked for information only in the CIC questionnaire, unsafe access conditions can still be relevant during a PSC inspection.

The practical approach is simple: check the plan and then check the actual access arrangements.

7. VGM, heavy weather and evidence

Cargo securing does not end when the last container has been loaded.

The CIC also looks at whether the cargo plan reflects the Verified Gross Mass (VGM) of containers being loaded.

The Chief Officer should be able to explain where the VGM data came from, how it was entered into the cargo system and how missing or amended information is handled.

Heavy-weather procedures are another part of the campaign.

Every vessel should follow its applicable procedures and take the necessary precautions to prevent cargo loss.

But if the ship encountered heavy weather before arrival, the PSCO may want to know what was actually done.

Were weather forecasts monitored? Were course or speed adjustments made? Were cargo checks carried out when conditions allowed? Were deck access restrictions introduced where necessary?

And are those actions properly recorded?

The same applies to post-departure cargo securing checks.

Records should reflect what the vessel actually did, not simply what the procedure says should be done.

8. A practical Master / Chief Officer preparation drill

If PSC may come tomorrow, I would not start with a two-hour lecture.

I would sit down with the Chief Officer and run a short practical drill.

The key questions would be:

  1. Can we quickly find the approved lashing arrangement and relevant limits for any selected bay?

  2. Do we understand the GM and wind assumptions used for cargo securing calculations?

  3. Can we confirm that the installed cargo securing equipment is approved for this vessel and its intended positions?

  4. Can we show how damaged equipment is identified, segregated and prevented from being reused?

  5. Do we know which maintenance or repair activities are permitted?

  6. Can we verify a random loaded bay from the cargo plan through the CSM and software to the actual deck?

  7. Are the applicable safe access arrangements in good condition?

  8. Can we show recent cargo securing checks and the precautions taken for heavy weather?

These questions are not a substitute for the official CIC questionnaire. They are a practical way to check whether the crew is ready to demonstrate compliance.

If the Chief Officer struggles to answer one of them, that is something worth addressing before the PSCO comes onboard.

Final thoughts

The 2026 Cargo Securing CIC is a useful reminder that paperwork, officer knowledge and actual onboard conditions must agree.

The approved CSM should be easy to use. Officers should understand the limitations of the cargo arrangements. Lashing software should reflect the actual loading condition. Securing equipment should be approved, serviceable and properly maintained.

And most importantly, the actual deck arrangement should match what the vessel is supposed to have.

A well-prepared vessel does not need to rely on memorised answers.

Don't prepare to answer “Yes”. Prepare to demonstrate why the answer is “Yes”.

Free onboard preparation checklist

To support shipboard preparation, I have put together a practical 40-point PSC CIC 2026 Cargo Securing checklist for Masters and Chief Officers.

It covers documentation, officer familiarisation, cargo planning, lashing calculations, equipment condition, fixed securing devices, safe access, heavy weather and inspection readiness.

The checklist is intended as an onboard preparation aid. It does not replace the approved Cargo Securing Manual, the ship's SMS, applicable regulations or the official CIC questionnaire.

Download: PSC CIC 2026 Cargo Securing — 40-Point Pre-arrival Checklist (Excel)

Official references